Basement drainage repair example
We will construct a drainage system around the lower basement area. The system will be constructed in 2 legs, starting on either side of the basement entry stairs, and discharging into a sump located on the right side of the house, (3 sides of this system will be...
Garage Foundation and Drainage Example
On the garage we will do the following work: 1. Slope trenches and lay 140 lineal feet of 4 inch perforated pipe in previously excavated areas surrounding new foundation walls. The pipe to tie into new discharge pipe installed by Alderson Construction. 2. ...
Spa installation example
On the new spa we will do the following work: 1. Tune and lay approximately 100 lineal feet of 4 inch perforated pipe in previously excavated areas surrounding new foundation/retaining walls. The pipe to connect to the existing 6 inch discharge pipe. The portion on...
Drainage, Underpinning Example
We will construct a drainage system along the rear and right sides of your home. The system will start at the left rear corner with a trench 4 feet deep. From here it will extend along the rear to the right corner, then continue along the right side to the front...
Home Drainage System
We will construct a drainage system along the rear and right sides of your home. The system will start at the left rear corner with a trench 4 feet deep. From here it will extend along the rear to the right corner, then continue along the right side to the front...
Drainage With Sump
Drainage Ward Construction is a leading expert in correcting drainage issues in the Bay Area. If you have any drainage concerns, call us for an opinion about how to best correct it. Fixing your drainage issues will remove moisture from your crawl spaces, dry out...
Drainage Pleasanton Example
Here's an example of a drainage project in Pleasanton We will construct a drainage system along the entire left and rear sides, and a 14 feet long portion of the front of the residence. The system will be comprised of 2 legs, each discharging into a sump located near...
Excavation – Retaining Wall Example
Retaining Walls sometimes need to be straightened. Here's an example work description: We will excavate behind a 6 lineal feet section of the right side retaining wall adjacent the right rear corner of your home. We will then cut the lagging behind the 2 posts and...
Excavation for catch basin connection
Catch Basins are sometimes necessary, and drainage may need to connect to a catch basin, for example: We will excavate a triangular area from the front of the garage back to the driveway catch basin to expose the existing 12-inch discharge pipe. We will then remove...
Drainage System With Sump
Many drainage systems require a sump pump: We will construct a drainage system along a 26 feet long portion of the front, the entire left side, and the rear side up to the left rear corner of the solarium. The system will be comprised of 2 legs, each discharging into...