Ward Construction provides services in the greater San Francisco Bay Area including, Oakland, Berkeley, Richmond, San Francisco, Walnut Creek, Lafayette, Orinda, Moraga, Hayward, Marin and other East Bay and North Bay cities.
Here’s an example of the type of services provided:
Per the plans, we will construct 13 bench piers along the right, left, and center foundations, 2 strip footings in the sub-area, and 1 replacement footing along the rear of your home. We will provide temporary support for the rear of your home as necessary. On top of the new strip footings we will install new sills and anchor bolts only. We will remove and not replace portions of the driveway and rear patio as necessary. We will remove and not replace a section of the cripple wall on each side of your home as necessary to remove the spoils from the sub-area. Owner to obtain building permit.
We will remove and replace the rear slab after the existing framing and roof has been removed by others.
Our prices for underground work, drilling, trenching or digging are based on soil conditions visible on the surface at the time of our estimate. Even if a subsurface soil investigation has been done by a competent soil engineer, this tells what the conditions are at the test site only. A few feet away different conditions may exist. If we encounter any subsurface conditions which require additional work such as, excessive ground water, cave-ins, loose fill, hard rock or other underground obstructions that require a change of method or change of location or change of equipment for the completion of the underground work, you should anticipate an increase in the cost of the job. The contract price for the work specified is based on ideal conditions and no extra work is included. The maximum width of the trench adjacent a foundation/retaining wall is 18 inches to accommodate trench shoring. If the existing footing exceeds this width, requiring a wider trench to achieve the desired depth or slope, additional costs will be incurred. Owner will be notified by contractor when any of the above conditions occur.